home of the Pure Awesomeness Factor Better Data, Better Skiing

Critical Path

Blue Revelstoke, BC

Steepest pitch35°
Vertical569 ft
Length1,597 ft
Average pitch21°
FacesW
Top3,311 ft

Critical Path drops 569 vertical feet over 1,597 feet of skiing, with a steepest pitch of 35° about 790 feet below the top. That's steeper than 100% of the 5,615 blue runs we've measured in North America, and the 24th steepest of 80 named runs at Revelstoke. It faces west.

How well Critical Path holds snow

Snow preservationPoor

Facing west at an average 21°, Critical Path gets about 121% of the winter sun that flat ground at Revelstoke does, December through March. That's sunnier than 87% of the runs we've measured, and the 9th sunniest named run at Revelstoke. Its top sits at 3,310 feet.

Angled toward the low winter sun, it bakes: powder turns heavy soon after a storm, and in spring it softens early in the day and refreezes hard overnight. Shading from ridges and trees isn't counted yet.

Critical Path profile

under 25°25–35°35–45°45°+ Hover to follow the line on the map.

Where it is on the mountain

Runs like Critical Path elsewhere

Nearby at Revelstoke

Measured by ZRankings from 1-meter lidar from Natural Resources Canada. Steepest pitch is the steepest stretch of about 50 vertical feet along the skiable line. Run lines come from OpenStreetMap and can sit a little off the skied path.