home of the Pure Awesomeness Factor Better Data, Better Skiing

Critical Path

Blue Revelstoke, BC

Steepest pitch31°
Vertical1,905 ft
Length6,804 ft
Average pitch17°
FacesW
Top7,299 ft

Critical Path drops 1,905 vertical feet over 6,804 feet of skiing, with a steepest pitch of 31° about 1,300 feet below the top. That's steeper than 97% of the 5,615 blue runs we've measured in North America, and the 40th steepest of 80 named runs at Revelstoke. It faces west.

How well Critical Path holds snow

Snow preservationBelow average

Facing west at an average 17°, Critical Path gets about 96% of the winter sun that flat ground at Revelstoke does, December through March. That's sunnier than 67% of the runs we've measured, and the 32nd sunniest named run at Revelstoke. Its top sits at 7,300 feet.

With little slope to hide behind, it takes nearly the full winter sun of open ground: powder settles and turns heavy sooner after a storm, and spring snow softens early. Shading from ridges and trees isn't counted yet.

Critical Path profile

under 25°25–35°35–45°45°+ Hover to follow the line on the map.

Where it is on the mountain

Runs like Critical Path elsewhere

Nearby at Revelstoke

Measured by ZRankings from 1-meter lidar from Natural Resources Canada. Steepest pitch is the steepest stretch of about 50 vertical feet along the skiable line. Run lines come from OpenStreetMap and can sit a little off the skied path.